Planning Board Fees and Applications
Brookline Planning Board Fees (Approved 10.19.2023)
Effective Nov 1, 2023.
Subdivisions* | |||||
Type of application | Application Fee | Per Lot Fee | Public Notice (RSA 676:4 l(d)) | Abutter notification | |
Subdivision - major | $300 | $750 (flat fee up to 10 lots) Over 10 lots: $750 plus $100 per lot over 10
| Cost | Postage cost plus $2 each | |
Subdivision – minor | $300 | $250 flat fee up to 3 lots | Cost |
| |
Voluntary merger (Caveat lot consolidation) | None |
|
| None | |
Lot Line Adjustment (no new lots) | $300 | cost | Postage cost plus $2 each | ||
| |||||
Excavations | |||||
Type of application | Application Fees | Public Notice (RSA 676:4 l(d)) | Abutter notification | ||
Excavation | $300 | Cost | Postage cost plus $2 each |
Misc Applications | |||
Type of application | Application fee | Public Notice (RSA 676:4 l(d)) | Abutter notification |
Sign Permits | At the discretion of the Selectboard |
|
|
Driveway Permits | $35 |
|
|
Scenic Road Tree Removal Permit |
| Cost of two public notices |
|
Site Plans* | ||||
Type of Site Plan Review Application |
Application Fee |
Per lot fee for Residential Site Plans |
Public Notice [In accordance with RSA 676:4,I (d)] | Abutter Notification [In accordance with RSA 676:4, I (b) AND must include three (3) labels per abutter] |
Determination of Change of Use | $50 |
|
|
|
Design Review – non-residential | $300 |
| Cost | Postage cost plus $2 each |
Final Review – non-residential | $300 |
| Cost | Postage cost plus $2 each |
Design Review – residential | $300 | $100/dwelling | Cost | Postage cost plus $2 each |
Final Review – residential | $300 | $100/dwelling | Cost | Postage cost plus $2 each |
Home Business | $100 |
| Cost | Postage cost plus $2 each |
* Applications may require additional review from engineers, or other consultants. Applicants will be billed separately based on time spent for review and inspections.
Nashua Regional Planning Commission
Town Planner
Town Counsel Review
Site Inspections
Town Engineer
Road Inspector
Other Consulting
Off-Site Improvement Agreement, plat or legal document Recording
To be billed separately, based on time spent for reviews and inspections
(Fees amended 10/3/89, 11/19/91, 11/7/95, 8/21/97, 5/6/99, 5/17/01, 10/04/01, 11/15/07, 06/18/09, 10/19/2023)