Planning Board Fees and Applications


Brookline Planning Board Fees (Approved 10.19.2023)


Effective Nov 1, 2023.

Subdivisions*

Type of application

Application Fee

Per Lot Fee

Public Notice (RSA 676:4 l(d))

Abutter notification

Subdivision - major

$300

$750 (flat fee up to 10 lots)

Over 10 lots: $750 plus $100 per lot over 10

 

Cost

Postage cost plus $2 each

Subdivision – minor

$300

$250 flat fee up to 3 lots

Cost

 

Voluntary merger (Caveat lot

consolidation)

None

 

 

None

Lot Line Adjustment (no new lots)

$300

 

cost

Postage cost plus $2 each

     
     

 

 

Excavations

Type of application

Application Fees

Public Notice (RSA

676:4 l(d))

Abutter notification

Excavation

$300

Cost

Postage cost plus $2 each

 

Misc Applications

Type of application

Application fee

Public Notice (RSA

676:4 l(d))

Abutter notification

Sign Permits

At the discretion of the Selectboard

 

 

Driveway Permits

$35

 

 

Scenic Road Tree Removal Permit

 

Cost of two public

notices

 

Site Plans*

 

 

Type of Site Plan Review Application

 

 

Application Fee

 

 

Per lot fee for Residential Site Plans

 

 

Public Notice [In accordance with RSA 676:4,I (d)]

Abutter Notification

[In accordance with RSA 676:4, I (b) AND must include three (3) labels per abutter]

Determination of Change of Use

$50

 

 

 

Design Review – non-residential

$300

 

Cost

Postage cost plus $2 each

Final Review – non-residential

$300

 

Cost

Postage cost plus $2 each

Design Review – residential

$300

$100/dwelling

Cost

Postage cost plus $2 each

Final Review – residential

$300

$100/dwelling

Cost

Postage cost plus $2 each

Home Business

$100

 

Cost

Postage cost plus $2 each

* Applications may require additional review from engineers, or other consultants. Applicants will be billed separately based on time spent for review and inspections.

               Nashua Regional Planning Commission

               Town Planner

               Town Counsel Review

               Site Inspections

               Town Engineer                                                                                        

               Road Inspector                                                                                       

               Other Consulting      

               Off-Site Improvement Agreement, plat or legal document Recording

To be billed separately, based on time spent for reviews and inspections

 

(Fees amended 10/3/89, 11/19/91, 11/7/95, 8/21/97, 5/6/99, 5/17/01, 10/04/01, 11/15/07, 06/18/09, 10/19/2023)